Our Projects

Ituid Valley Project

Project Owner

Asir Water Directorate

Project Type

Etoid Water Project / Water Treatment Plant

Project Date

2007

Project Location

Wadi Itwid – Abha

Ituid Valley Project

Supply, installation, testing and operation of 20 national VTP well stations, each with a capacity of 180 m3/h 40 m. 4 national VTP for temporary solution each 270 m3/h 175 m, 300 hp. 3 Ritz booster pumps 540 m3/h, 175 m, 500 kW each. 380V, 50°C. Pipes and fittings

From Equipment to execution full – service water solutions

Get In Touch With Us

For any inquiries, feel free to fill out the form below and our team will get back to you as soon as possible.

Phone Number

+966 (11) 2088558

Email Address

info@nwwc.com.sa

Address

14211 Eastern Ring Branch Rd, Ar Rayyan, Riyadh 14211, Saudi Arabia